- If I delete directories in the NAS that the NAS backup routine is set to backup on a scheduled job, the scheduled job will fail – even if 99.9% of the other directories are still in place/intact
- I can only set one NAS backup job to a specific external HDD. Therefore if I want to set two external backup jobs (even if they are configured to run days apart) I need to set each to a separate external device